№ слайда 1 Across Time and Distance…
Описание слайда:

Across Time and Distance…

№ слайда 2 INCOTEC GROUP was founded in 1992
Описание слайда:

INCOTEC GROUP was founded in 1992

№ слайда 3 The structure of INCOTEC GROUP was originally created with the aim of provision
Описание слайда:

The structure of INCOTEC GROUP was originally created with the aim of provision the utmost effective coordination between all sectors of transportation process.

№ слайда 4 INCOTEC GROUP consisted of the following departments:
Описание слайда:

INCOTEC GROUP consisted of the following departments:

№ слайда 5 Port Forwarding Department
Описание слайда:

Port Forwarding Department

№ слайда 6 Multimodal Transportation Department
Описание слайда:

Multimodal Transportation Department

№ слайда 7 Railway Transportation Department
Описание слайда:

Railway Transportation Department

№ слайда 8 Shipping Agency Department
Описание слайда:

Shipping Agency Department

№ слайда 9 Survey Department
Описание слайда:

Survey Department

№ слайда 10 Inland Trucking Department
Описание слайда:

Inland Trucking Department

№ слайда 11 Customs Clearance Department
Описание слайда:

Customs Clearance Department

№ слайда 12 Project Cargo Transportation Department
Описание слайда:

Project Cargo Transportation Department

№ слайда 13 In the year of 2001, September 28th, this department got its legal name INCOTEC
Описание слайда:

In the year of 2001, September 28th, this department got its legal name INCOTEC CARGO Ltd. Since that time INCOTEC CARGO has arranged transportation of many projects. Let us describe some of them.

№ слайда 14 The year of 2005.Customer: Kirishinefteorgsintez (KINEF)
Описание слайда:

The year of 2005.Customer: Kirishinefteorgsintez (KINEF)

№ слайда 15 Multimodal transportation of 23 reactors and columns to the job site.
Описание слайда:

Multimodal transportation of 23 reactors and columns to the job site.

№ слайда 16 Weight up to 1065 MT each, length up to 69 m. and diameter up to 10,5 m.
Описание слайда:

Weight up to 1065 MT each, length up to 69 m. and diameter up to 10,5 m.

№ слайда 17 The 1st shipment arrived at the port of St. Petersburg in May on board of geared
Описание слайда:

The 1st shipment arrived at the port of St. Petersburg in May on board of geared vessel equipped with 2 cranes by 900 MT SWL each.

№ слайда 18 Design works had been carried out and as a result 2 types of barges had been ref
Описание слайда:

Design works had been carried out and as a result 2 types of barges had been refitted as Roll-on/Roll-off (Ro-Ro) for this very shipment.

№ слайда 19 These barges delivered the cargo to berth in Kirishi, which has been specially b
Описание слайда:

These barges delivered the cargo to berth in Kirishi, which has been specially built for this equipment receipt. All handling operations were carried out by ballasting the barge.

№ слайда 20 The cargo has been discharged and delivered to the job site by means of SPMTs.
Описание слайда:

The cargo has been discharged and delivered to the job site by means of SPMTs.

№ слайда 21 During the period of river navigation 2005 we arranged 12 voyages.
Описание слайда:

During the period of river navigation 2005 we arranged 12 voyages.

№ слайда 22 The route of transportation from the Port of St. Petersburg to Kirishi was as fo
Описание слайда:

The route of transportation from the Port of St. Petersburg to Kirishi was as follows:

№ слайда 23 Volume shipped - more than 25 000 freight tons.
Описание слайда:

Volume shipped - more than 25 000 freight tons.

№ слайда 24 The year of 2010The Customer: Izhorskiye Zavody by order of OMZ (Uralmash – Izho
Описание слайда:

The year of 2010The Customer: Izhorskiye Zavody by order of OMZ (Uralmash – Izhora Group)

№ слайда 25 Simultaneous transportation of 2 hydrocracking reactors (total weight 2 500 MT -
Описание слайда:

Simultaneous transportation of 2 hydrocracking reactors (total weight 2 500 MT - 1250 MT each, 37,5 m. x 7,7 m. x 6,5 m.) for Oil Refining and Petrochemical Complex TANECO in Nizhnekamsk.

№ слайда 26 Preparation took about 900 days. New berth on Neva River was built as well as th
Описание слайда:

Preparation took about 900 days. New berth on Neva River was built as well as the road leading to it, it had been approved by Russian Railways JSC to close the railway crossing, the barge had been strengthened.

№ слайда 27 The specialized dock type berth was built in Nizhnekamsk. The discharging of hea
Описание слайда:

The specialized dock type berth was built in Nizhnekamsk. The discharging of heavyweight cargo by means of flooding dock was the first experience in present-day Russia.

№ слайда 28 Loading operations in Saint Petersburg as well as discharging in Nizhnekamsk wer
Описание слайда:

Loading operations in Saint Petersburg as well as discharging in Nizhnekamsk were held by Ro-Ro method

№ слайда 29 Discharging in Nizhnekamsk
Описание слайда:

Discharging in Nizhnekamsk

№ слайда 30 The route from berth on Neva River to Nizhnekamsk was as follows. The distance o
Описание слайда:

The route from berth on Neva River to Nizhnekamsk was as follows. The distance of about 1800 kilometers had been got by 10 days.

№ слайда 31 The project was fulfilled and the cargo was delivered to the Consignee.
Описание слайда:

The project was fulfilled and the cargo was delivered to the Consignee.

№ слайда 32 Years of 2010-2012 The Customer: OJSC TANECO (Nizhnekamsk)
Описание слайда:

Years of 2010-2012 The Customer: OJSC TANECO (Nizhnekamsk)

№ слайда 33 Since 2010 INCOTEC CARGO Ltd was involved in door-to-door delivery of complete p
Описание слайда:

Since 2010 INCOTEC CARGO Ltd was involved in door-to-door delivery of complete petrochemical equipment (weight up to 240 MT, length up to 45 m., width up to 9 m., height up to 7,5 m.) from Europe, North America, Asia. These shipments were within the context of Oil Refining and Petrochemical Complex construction OJSC TANECO.

№ слайда 34 CCR Plant delivery from South Korea (direct sailing from Onsan to St. Petersburg
Описание слайда:

CCR Plant delivery from South Korea (direct sailing from Onsan to St. Petersburg) consisted of 6 Modules, total volume of shipment was 9 000 freight tons.

№ слайда 35 For that cargo geared vessel was chartered. She has 2 cranes by 275 MT SWL each.
Описание слайда:

For that cargo geared vessel was chartered. She has 2 cranes by 275 MT SWL each.

№ слайда 36 In the Port of St. Petersburg Modules were discharged directly on board of 3 riv
Описание слайда:

In the Port of St. Petersburg Modules were discharged directly on board of 3 river-going vessels which delivered them to Nizhnekamsk.

№ слайда 37 Upon discharging in Nizhnekamsk, Modules were delivered to the job site.
Описание слайда:

Upon discharging in Nizhnekamsk, Modules were delivered to the job site.

№ слайда 38 Delivery of Reactor Column (45 m. length) from Italy
Описание слайда:

Delivery of Reactor Column (45 m. length) from Italy

№ слайда 39 The total volume of shipped equipment is more than 50 000 freight tons. Del
Описание слайда:

The total volume of shipped equipment is more than 50 000 freight tons. Deliveries were arranged by sea, railway, river, air and trucks.

№ слайда 40 Year of 2012 (November – December)The Customer: Baltiysky Zavod JSC
Описание слайда:

Year of 2012 (November – December)The Customer: Baltiysky Zavod JSC

№ слайда 41 Delivery of core melt trap with total weight of 770 MT for second power unit of
Описание слайда:

Delivery of core melt trap with total weight of 770 MT for second power unit of Leningrad Nuclear Power Plant-2

№ слайда 42 The heaviest items (weight up to 161 MT) were delivered by floating crane and th
Описание слайда:

The heaviest items (weight up to 161 MT) were delivered by floating crane and then this crane reloaded equipment on trucks.

№ слайда 43 That time was not the first one when INCOTEC CARGO arranged transportation of he
Описание слайда:

That time was not the first one when INCOTEC CARGO arranged transportation of heavyweight and oversized cargo for second power unit construction of Leningrad Nuclear Power Plant-2. In autumn 2009 we delivered identical core melt trap which was also produced by Baltiysky Zavod JSC.

№ слайда 44 Among our Customers such Companies as:Atomstroyexport JSC Baltiysky Zavod JSCGaz
Описание слайда:

Among our Customers such Companies as:Atomstroyexport JSC Baltiysky Zavod JSCGazprom podzemremont Orenburg JSCIzhorskiye ZavodyKirishinefteorgsintez (KINEF)Podolsk Machine Building Plant JSCPower Machines OJSCRosenergoatom Concern OJSCSalavatnefteorgsintez JSCSurgutneftegas OJSCTANECO OJSCTechnopromexportTerminal-Alstom LLCUralhimmash JSC

№ слайда 45 More detailed information about us and our experience you can find on our websit
Описание слайда:

More detailed information about us and our experience you can find on our websiteWWW.INCOTEC-CARGO.RU